3.4
Installing the SK-FFT
SK-FFT installation involves the following steps:
•
Make physical connection to any outputs that will power* the SK-FFT. (See
Section 3.5).
•
Set the DIP switch ID for the SK-FFT (See Section 3.6.1).
*See Appendix A for compatible powering devices. Silent Knight Installation Manuals
can be found on Silent Knight's web site at www.silentknight.com.
3.5
Operating Power
This section provides instructions to install the appropriate DC power source.
1. Connect the SK-FFT to the appropriate DC power source. See Section 2.4.1 for
power requirements. For compatible product see Table A-1.
2. Use the on-board DIP switch to assign the configuration setting to the SK-FFT.
(See Section 3.6.1).
54711
Installation
3-7