Chapter 1. Checking the Delivery Contents
Important ATTENTION: Please read carefully the safety instructions
1.1.
Unpacking the Server
Important Before unpacking the server inspect the server packaging
W020
W020:
The server drawer must not be unpacked before it has reached the
room temperature (24 hours in the computer room).
According to the server configuration, the following items are included:
• Compute Box fully populated
• Empty Ubox(es)
• UBox components
• 8-module connecting box
• Rack-mounting kits
• Screws and washers
before you perform the procedures described in this
manual.
Multilingual Safety Notices Guide
for damage.
WARNING
Chapter 1.
Checking the Delivery Contents
1-1