Receiving And Unpacking The Equipment - GE Voluson 730Expert Service Manual

Table of Contents

Advertisement

GE H
- K
EALTHCARE
RETZTECHNIK
D
105899, R
IRECTION
EVISION
Section 3-3

Receiving and Unpacking the Equipment

CAUTION
Transport only with forklift or stracker truck.
During transport pay attention to the point of gravity ("tilt and drop" indicator)!
!! CAUTION:
Have two people available to unpack the Voluson® 730Expert.
Attempts to move the unit considerable distances or on an incline by one person could result
in injury or damage or both.
The device must only be transported in the original packaging!
NOTICE
Unpack the devices such a way that packaging can be reused.
!! NOTICE:
A drill with size 20 torx bit and/or a Philips 2 screwdriver will be needed to open the crate.
Table 3-4
Step
1.
Loosen the screws and remove top panel from crate; top panel is used for the ramp.
center
of
gravity
3-4
3
DRAFT (A
Figure 3-3 envelope at front panel of the crate
Unpacking Procedure
Section 3-3 - Receiving and Unpacking the Equipment
29, 2008)
PRIL
The envelope with delivery address, packing list and
invoice is located on the front panel of the crate.
Check whether delivery is complete (according to
packing list) and check visual damage!
Task
tilt and drop
indicator
V
® 730E
OLUSON
XPERT
S
M
ERVICE
(BT03)
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents