Honeywell HON 5020 User And Maintenance Manual page 52

Gas pressure regulator with hon 630 pilot
Hide thumbs Also See for HON 5020:
Table of Contents

Advertisement

Next task
HON 5020 gas pressure regulator with HON 630 pilot
Figure
Depending on what you want to do next, proceed as indicated in the relevant section:
 Maintaining the pilot (see page 53)
 Completing the maintenance (see page 88)
Step
Description
6
Lightly grease the inside and outside edge
of the new diaphragm.
7
Re-assemble the diaphragm unit.
8
Re-assemble the regulator unit.
Push the lid down when screwing down
the screws until they are completely
secured. Refer to the additional tightening
torque information at the beginning of this
topic. Tighten the screws in a criss-cross
sequence.
Maintenance
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents