Establishing System Ground - Cisco UCS 6400 Series Hardware Installation Manual

Fabric interconnect
Table of Contents

Advertisement

Installing the Cisco UCS Fabric Interconnect
a) Insert 2 screws (12-24 or 10-32, depending on rack type) through the front rack-mount brackets and into
the threaded holes in the rack post.
b) Repeat for the front rack-mount bracket on the opposite rack post.
Figure 12: Attaching the Front Rack-Mount Brackets to the Rack Posts

Establishing System Ground

The system ground is referred to as the network equipment building system (NEBS) ground. You must use
the NEBS ground on AC-powered systems if you are installing this equipment in a U.S. or European Central
Office.
The NEBS ground provides additional grounding for EMI shielding requirements and grounding for the
low-voltage supplies (DC-DC converters) on the modules, and is intended to satisfy the Telcordia Technologies
NEBS requirements for supplemental bonding and grounding connections. You must observe the following
system grounding guidelines for your chassis:
• You must install the NEBS ground connection with any other rack or system power ground connections
• You must connect both the NEBS ground connection and the power supply ground connection to an
that you make. The system ground connection is required if this equipment is installed in a U.S. or
European Central Office.
earth ground. The NEBS ground connection is required if this equipment is installed in a U.S. or European
Central Office.
Cisco UCS 6400 Series Fabric Interconnect Hardware Installation Guide
Establishing System Ground
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ucs 6454 fiUcs 64108 fi

Table of Contents