6.9 Startup Checks

All control system panels have cables pre-installed and factory-tested before shipment. However, final checks should be made
after installation and before starting the equipment.
Warning
Inspect the cabinet components for any damage possibly occurring during shipping. Check for loose cables, wires,
connections, or loose components, such as relays or retainer clips. Report all damage that occurred during shipping to GE
Product Service.
Attention
Installation Guidelines
This equipment contains a potential hazard of electrical shock or burn. Power is
provided by the control system to various input and output devices. External sources
of power may be present in the control system that are NOT switched by the control
power circuit breaker(s). Before handling or connecting any conductors to the
equipment, use proper safety precautions to ensure all power is turned off.
Deposits containing ionic contaminants such as salt are difficult to remove completely,
and may combine with moisture to cause irreparable damage to the boards.