2.3.3 Routine Maintenance for the New Main Way

The power-off operation may interrupt all services. Before the power-off operation, ensure
that emergency plans have been worked out and approved by parties involved. Huawei bears
no responsibility for any accidents or loss.
Table 2-11 Routine maintenance items for the new main way
Maintenance
Item
Check the
connections of
input and
output power
cables.
Check the signs
of rodent
movements in
the new main
way.
Check the
exterior of the
new main way
component.
Issue 01 (2019-03-05)
Maint
Operation
enance
Interv
al
Mai
Operation
nten
ance
Peri
od
Mont
Visual
hly
observation
Mont
Visual
hly
observation
Quart
Visual
erly
observation
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Expected
Result
Standard
Troubleshooting
The
Replace damaged cables.
cables are
Secure output terminals.
not
damaged.
The
terminals
are intact
and
secure
and free
from
spark
signs and
rust.
No signs of
If there is a sign of rodent
rodent
movements, ask a
movements
professional to trap the
are found in
animals.
the new main
way.
The exterior
Seal the damage if it is not
is intact.
severe. Replace the
component is the damage is
severe.
2 Routine Maintenance
Troubleshooti
ng
signal cables.