Connecting To Load - Honeywell temaline TK C21P Installation Manual

Plc processor
Table of Contents

Advertisement

Connecting to load

Connect each of the cables from the load to one of the 4 available
output connectors, as shown in Figure 7. Internally, all of the output
lines are provided with Power Mosfet that can drive to ground:
When the cables go outdoor is mandatory to use shielded cables. The
cables' shielding must be connected to the respective ground
connectors (-V).
For internal wiring without shielded cables is recommended an
electrical environment where the cables are well separated, even at
short runs, especially to the power cables or external cables which
can be essentially subjected to interference or lighting.
INSTALLATION
1,2A 30V continuous
5A 30V (0,5 sec) peak current for inductive loads
J4
J5
J3
J5
J2
Figure 5: Connecting to resistive loads
DC OUT
10-30VDC
AC IN
Isolated
Power supply
J4
J3
J2
J1
JP2
JP3
SW1
SW1
LED1
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Temaline rtu a11Temaline tk c21sTemaline rtu a01p

Table of Contents