Mains Load Optimization; Connecting Diagrams - AEG THYRO-S Series Operating Instructions Manual

Thyristor switch
Table of Contents

Advertisement

6. Mains load optimization

Thyro-S is not suitable for mains load optimization in multiple controller applications.
If mains load optimization is necessary, Thyristor controllers of type Thyro-A or
Thyro-P must be used.

7. Connecting diagrams

Thyro-S can be employed in single phase switch and in three phase switches which
can be transposed to single phase switches, e.g. star connections with MP conductor
or N conductor and in open delta connection.
It is possible to apply 2 identical Thyro-S as a three phase saver circuit (with delta
load or star without N), if the triggering signal for both controllers is set up at the
same time. See Fig. 5.
46
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thyro-s 1s h1 series

Table of Contents