Cisco 7513 Hardware Installation And Maintenance Manual page 80

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Allow
back
it
installing or
components
power
Maintain
air inlet
directly
can
Install
and
equipment
equipment
unnecessarily
Always
and
should
If
you
the chassis
cantilevered
unstable
of the
To
Rack-Mount
the
In addition
conditions
Caution
not properly
Environment
Site
The
router
data processing
do
so
to
exceeds
supports
blower
the
suited for unattended
The
router
blower
airflow
the chassis
condition
to
protect
around
clearance
sufficient
wall or cabinet for
near
interface
moving
processors
allow
Otherwise
and
modules
supplies
processor
minimum
clearance
and
exhaust
ports
respectively
next
another
equipment
to
and
enter the
vents
inlet
air
and
use the cable
management
out of the
of processor
way
and
cabling
that
is
already
will not impair
access
perform equipment
to
heavier
install
equipment
from
the rack
prevent
falling
be
than
20
not
inches
higher
racks be
use Telco-type
sure
mounts
two
the
rack
to
Ensure
off of the posts
Some
racks
Telco-type
rack
equipment
in the
the chassis
properly
install
in
Kit
Instructions
Installation
document version
which
latest
the preceding
to
guidelines
the section
in
Equipment-Rack
To
chassis overheating
prevent
ventilated
air
or
conditioned
can
standalone
as
operate
environment The blower
or lab
and
maintain
an
acceptable
23C
blower
the
increases
speed
under normal
quieter
operation
at
is
operating
100-percent
room
or
computer
dry clean
requires
well-ventilated
pulls ambient
the chassis
air
through
minimum
maintain
of
two
the airflow
blocked
If
is
Under
occur
can
extreme
the
system components
the rack
maintenance
for
If
normal
and
out
operation
pull
it
connecting
cables
cm
19 inches
48.3
of clearance
and
of
inches
the rear
on
six
Avoid
the router
placing
rack Otherwise
the heated
cause
an
condition
overtemperature
bracket
included
with
the router
modules
and
power
supplies
rack Ensure
in the
installed
the interface
or require
to
processors
maintenance
or
upgrades
the lower
half of
rack
in
to
over
one
Cisco
If
install
you
from
the floor
the rack
bolted
that
to
is
posts with
the chassis ears
the weight
of the chassis does
that
secured
also
are
to
brackets
ceiling
rack
use the instructions
in
Document Number
rack-mount
accompanies
the
review
the precautions
for avoiding
Ventilation
in this
chapter
the router in an enclosed
install
never
on
table or
system
placed
55
at
operates
percent
inside the chassis
operating
temperature
reaches
until
linearly
it
conditions
approximately
70
is
capacity
approximately
use
and
air-conditioned
cool
the
to
internal
components
inches
of clearance
both
the
at
or restricted or
the
if
inlet
air is
the environmental
conditions
Site
the rack
mobile you
can
is
when
maintenance
for
necessary
or replacing
or upgrading
remove
blower
the
module
to
front of the chassis
the cooling
for
an
rack
in
overly
congested
from
exhaust
other
air
equipment
inside the router
keep
cables
to
organized
blower module
the
Consider
from
cables
other
that
disconnect
cables
to
you
low
maintain
center of gravity
7513
rack
the chassis
bottom
in
and
the
One
end
floor
secured
and
the
of the chassis
rest
is
make
not
the rack
warranted by
the weight
if
the configuration
note
Cisco
where xx
78-2023-xx
indicates
kit
overtemperature
room
rack
or
that
rack-mounted
in
as
system
when
of capacity
is
it
possible
the temperature
If
100
blower
the
Although
percent
dBa
when
62
the noise level
dBa
Therefore
the router
is
environment
The
internal
To
allow
sufficient
and
exhaust
inlet
openings
too
warm
an overtemperature
down
monitor
shut
will
the
power
for
Installation
Preparing
Requirements
push
or
the
of
7513
is
best
on
2-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents