Cisco 7513 Hardware Installation And Maintenance Manual page 227

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Follow
Step
Step
Step
Figure
Step
Step
Step
This
completes
and
Removing
Replacing
The power
on
the faceplate
power
On
the
nylon
screwdriver
Warning
second
of
two power
supply
power
blower module
these
the
to
steps
replace
blower
Locate
the
module
the chassis
See
5-14
Figure
Use
fiat-blade
screwdriver
module See
blower
Figure
the handle
on
the front of the
Grasp
See
5-14
Figure
and
5-14
Removing
Replacing
Captive
Place
removed blower module
the
To
blower
module
the
replace
use both
hands
as
to
you
down
module
and
facing
module
the chassis
into
Keep
chassis
When
blower module
the
installation
on
screws
the front of the
blower module
the
Power
Supply
on
the
supplies
rest
floor
of the
AC-input power supply
cable
connector
the cable
to
prevent
DC-input power supply you
cable
the
ties
after
install
you
need
also
pair of wire
you
It
is
only
turn
necessary
to
if
power
supply
installed
removed
supplies
high
To
opening
avoid
injury or
while
opening
supply
power
Removing
which
above
the card
is
cage
and
loosen
the captive
screws
5-14
module and
slowly
Blower Module
the
screws
installation
in an
antistatic
bag
hold the handle
with
either
handle
the
and
module
with
Up
the Insert
This
Side
label
the
module
as
straight
is
the
the chassis
way
into
all
blower module
removal and
replacement
procedure
of the chassis under
the card
cable-retention
from
accidentally
being
two
provide
cable
ties for
nylon
new
DC-input power
supply
for
procedure
cutters
this
OFF
supply
if
power
you
OFF When
does
need
be
not
turned
to
exposed on
current
the
is
system do
damage
the
not
to
ON
the remaining
is
to
power supply
and
Replacing Chassis
on
the interface
processor
end
fasten each
of the
that
out of the chassis
pull
it
straight
storage or return
the factory
for
to
hand
left
your
or
right
blower
the intake
vents
on
the
new
the
up
insert
facing
as
into
possible
you
it
as
guide
the captive
opening
tighten
AC
On
the
cage
receptacle
band
molded
around
the
wraps
from
out or
pulled
falling
cable
relief
strain
Replace
In
addition
to
slotted
large
will
you remove
it
power
ON
the
with
is
power
connector
inside the
power
conductive
insert
anything
Maintaining
Components
end
of
as
long
blower
the
located
out
the
the
to
one
power
into
the
the Router
5-65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents