Cisco 7513 Hardware Installation And Maintenance Manual page 166

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

and
Configuring
Installing
Using
to
backplane
are
the
also
It
is
board
Any RSP2
Detailed
and removing
Caution
system
or replace
procedures
seated
Note
provided
Figure
7513
Hardware
5-4
Cisco
Processor
Modules
the handle
remove
to insert
or
the
full
90-degree
position
which
hang
state
will
pushed
into
position
fully
backplane
use the ejector levers
important
to
from
connector
pins disconnect
or interface
processor
steps for correctly performing
interface
processors
RSP2
The
is
required
system shutdown and
will cause
an
abrupt
down
RSP2
the
shut
first
would
that
following
you
removed
modules
Place
processor
with
material
your packing
Board
Rack
with
5-1
and
Maintenance
Installation
interface
an
processor
leave
all of the connector
some
not
can
the
the ejector levers
system Using
three layers of pins are
ensures
that
all
when
removing
an
the logical sequence
the backplane
in
connected
that
is
only
partially
OIR
included
the following
are
in
removing
component
system
damage
can
then
follow
all
power
system
OIR
for
to
ensure
that
the collapsible
black-cardboard
in
shown
5-1
in Figure
as
Processor
Modules
push
the ejector
or
to
failing
mated
the
pins
to
and making
sure
mated
or
with
free
interface
to
ensure
processor
the
by
expected
the backplane
hang
can
to
for
procedures
installing
down
without
shutting
it
first
To remove
or destroy
memory
files
same removal and
the
insertion
module
the processor
properly
is
board
racks
that
levers
that
they
from
the
that
system
bus
the
the
were

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents