Cisco 7513 Hardware Installation And Maintenance Manual page 79

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Site
Requirements
To
use the rack-mounting
To mount
width
The
When
provided
rack-mount
If
install
Figure
19
for
When
Install
unavoidable
If
the Cisco
7513
Hardware
2-14
Cisco
hardware
between two
the router
between
the inner
sides of the
height of the chassis
is
the router
mounting
the chassis
secure
to
be
kit
might
not
the rack
has
vertical
power
and remove
processor
2-1
See
Figure
Chassis
2-1
Footprint
inches
required
removal
blower
rack
planning
your
installation
the router
in an
open
the rack
ensure
that
an equipment
use
you
plan
to
and
dimensions
of the chassis
customized
are designing
7513
Installation
and
Maintenance
with
the router
provided
using the
posts or
rails
two
posts or rails
cm
33.75
inches
85.725
in
or Telco-type
four-post
the rack
Anything
to
posts
the weight
sufficient
to
support
or other obstacle
strip
which
must be
modules
and
Outer Dimensions
consider
the following
whenever
rack
possible
If installation
has adequate
ventilation
shelf ensure
the
that
shows
2-1
the chassis footprint
Figure
We
recommend
shelf
that
consider
the following
the inner
mounting
ears
must be
inches
at least
17.72
racks be
sure
use
of the screws
to
all
than
the screws
less
all
of the chassis
there
ensure
that
sufficient
is
out of
their
pulled
straight
guidelines
an
enclosed
in
constructed
shelf
is
to
support
which you
rack-mount
use the
kit
you
guidelines
clearance
the
cm
45
the
in
provided
clearance
to
slots
Plastic
front
end
panel
rack
is
the weight
need
will
if
you
for
designed

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents