Mounting/Dismounting; Before Installation; Dimensions - Honeywell Centra Line CLIF-CBUSLC Installation & Commissioning Instructions

Table of Contents

Advertisement

CLIF-CBUSLC INTERFACE – INSTALLATION & COMMISSIONING INSTRUCTIONS

MOUNTING/DISMOUNTING

Before Installation

IMPORTANT
To allow the evaporation of any condensation resulting from low shipping / storage temperatures, keep the device at room
temperature for at least 24 h before applying power.
US requirement, only: This device must be installed in a UL-listed enclosure offering adequate space to maintain the
segregation of line voltage field wiring and Class 2 field wiring.
In the case of vertical mounting on DIN rails, the CLIF-CBUSLC should be secured in place using a commercially-available
stopper. See also the CLIF-CBUSLC – Mounting Instructions (MU1Z-1006GE51).

Dimensions

RS485-1
J1
J8
1
2
Fig. 12. CLIF-CBUSLC (shown: model with onboard I/Os), dimensions (in mm)
J1
J8
NOTE:
Use of the covers (MVC-80-AC1) obstructs access to the Ethernet and USB 2.0 Host Interfaces and RS232 socket.
EN1Z-1026GE51 R0417
215.5
24 25 26
27 28 29 30 31 32
215.5
Fig. 13. CLIF-CBUSLC with covers, dimensions (in mm)
45
12
57.5
49.5
52
57.5
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents