Panel fixing

Panel fixing
a) Remove panel from its
packing.
b) Store the front panel (including
the electronic assembly) and
the metal plates in a safe place
until later.
c) Check the spare parts supplied
with those listed in Table 1.
d) Remove the appropriate
knock-in on the panel case for
cable entry.
e) Hold the panel on the wall in
the desired mounting position
and mark the positions of the
fixing holes. See Figure 9 for
case fixing details.
f) Secure the panel to the wall
using suitable fixings. A top
centre keyhole fixing is
provided on the case to allow
the panel to be hooked whilst
the bottom two fixing points are
located.
NOTE: For details on flush
fixing the panel, see Figure 11.
g) Connect the mains supply
cable to the panel. The cable:
· must be fed through one of
the dedicated mains cable
entry points into the panel.
· must be via an unswitched
fused spur unit, rated 5A for
the 1&2 Zone Control and
Repeat panels and 7A for 4&8
Zone panels.
· The fused spur isolator cover
should be red and marked:
FIRE ALARM - DO NOT SWITCH
OFF
· The fused spur units must be
fed from a dedicated isolation
switch used for the fire alarm
system only.
h) Wire the system. With the
exception of mains cable, all
other cables should remain
unconnected at the panel. For
the unconnected cable leave
300mm tail wire length and
mark each core identifying its
final point of connection.
The system wiring can be
tested whilst not connected to
the respective terminals at
each system device.
Description
For fuse location
see Figure 12
10K end-of-line resistor
Capacitor unit or bipolar
capacitor
End of line label
Fuse 3.15A 20mm x 5mm
AS (mains terminal block )
Fuse 3.15A 20mm x 5mm
QB (battery FS2)
Fuse 0.5A 20mm x 5mm
QB (24V) UL Rated FS11
Battery link
Zone designation label
M3 screws
Table 1 Spare parts supplied with each panel
CAUTION: DO NOT
undertake high voltage
insulation tests WITH THE
CABLES CONNECTED to
their terminals. This may
damage the electronic
circuitry in the product.
I) Refit the front panel (including
the electronic assembly ) into
the panel using four M3 screws
and connect the transformer
cable and earth cable, see
Figure 10 .
Panel size
395mm wide x 274mm high x 87mm deep
Dedicated mains
cable entry points
111mm
Transformer
cables
to electronic
assembly
Earth connection
to the electronic
assembly
Panel Backbox
Figure 9 Panel fixings
6
Quantity supplied with control panel
1 zone
2 zone
4 zone
2
2
4
1
2
4
3
4
8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
8
8
8
j) Attach the top and bottom
metal plates using four M3
screws, see Figure 11 .
NOTE: Each terminal in a panel
will accept a maximum
conductor size of 2.5mm
NOTE: The installation of all
outstanding parts is usually
carried out during
Commissioning of the System.
How to knock-in
a cable entry point
89mm
89mm
Fire Panels
Repeat
panel
8 zone
8
8
16
1
1
1
1
1
1
1
1
1
8
8
2
.
Knock here to open
the entry point
4-off
earth points
4188-424 issue 4_Part 1_10-09

Advertisement

Table of Contents
loading

Table of Contents