Verifying Proper Ac Power Connection - Honeywell Vertex Operating Manual

72-point continuous monitor
Table of Contents

Advertisement

Black
(or Brown*)
White
(or Blue*)
N
L
*Colors for European installation
Figure 1 – AC Power Connection
2.6.2 Verifying Proper AC Power
Connection
Before powering up the Ver tex
connections using a multimeter to determine the
connections are correct and correct voltages are
present at the power connection.
Note:
eries and eries
oints di er slig tl in t eir a earance and are
illustrated in igures and
Vertex Technical Handbook
Green/Yellow
or Green
, verify the
®
erte
o er connection
®
elo .
V
ertex
72-Point Continuous Monitor
TM
Figure 2 – Vertex
Figure 3 – Vertex
Verifying Line Connection:
Touch the red multimeter lead to the line/hot
connection and touch the black lead to the ground
lug (see Figure 4). The meter should display a
voltage verifying the presence of 230 VAC.
2-9
Series 1
®
Series 2
®

Advertisement

Table of Contents
loading

Table of Contents