Parts Identification
1.
Hopper Lid
2.
Bean Hopper
3.
Bean Shutoff Knob
4.
Hopper Alignment Indicator
5.
Control Panel
6.
Grind Adjustment Assembly
This is a quick start guide only. Detailed instructions can be found in the full manual
on our website at
baratza.com/documentation
INITIAL SETUP
1.
Hand-wash the hopper lid (1), bean hopper (2), grounds bin (9), and removable grounds tray
Do not wash the grind adjustment assembly
2.
With the bean shutoff knob
hopper in place and rotate firmly clockwise until the hopper clicks into place. Install hopper lid
adjustment until black grind setting indicator is on 18.
a setting of 31 or smaller for the motor to start. Ensure the shutoff knob (3) is in the open position.
www.baratza.com
1
2
9
7.
Adjustable Portafilter Hook
8.
Convertible Device Arms
9.
Grounds Bin
10.
Power Cord Port
11.
Removable Grounds Tray
12.
LCD Display
(6)
in water or it will rust.
(3)
facing the 11 o'clock position, line up the 3 hopper tabs with the slots in the top of the grinder. Set the
Note: The hopper must be installed and the black grind setting indicator (20) on
SETTE 270Wi QUICK START GUIDE
13
14
4
5
15
18
6
7
20
21
11
22
13.
Memory Preset Buttons
& Indicators
14.
Grinding Indicator
15.
Stop
16.
Start/Pause
17.
Grind Weight Adjustment
Buttons
(11)
12
16
17
19
18.
Installation/Removal Tab
(blue)
19.
Installation/Removal
Indicator
20.
Macro Adjustment (black)
21.
Stepless Micro Adjustment
22.
Bag of Tools
in warm, soapy water, and dry thoroughly.
(1)
onto bean hopper (2). Rotate macro
Rev 03/27/2018 (v1a)