Example Procedure: Transmitter Calibration - GE Druck PV 622 User Manual

Druck pv 62x series. pneumatic/hydraulic pressure stations
Table of Contents

Advertisement

Issue 1
* Reference

5.3.7 Example procedure: Transmitter calibration

1
2
5-8 Pressure calibrator operation (DPI 620)
4. To set the necessary pressure or vacuum for the calibration,
use the specified procedures for your PV 62x pressure
station*.
PV 621 models: see Chapter 2 (Pneumatic pressure
operation (PV 621))
PV 622 models: see Chapter 3 (Pneumatic pressure
operation (PV 622))
PV 623 models: see Chapter 4 (Hydraulic pressure
operation (PV 623))
4
3
1. Assemble the pressure calibrator with the correct PM 620
module and PRV (if applicable); see Section 5.2.3.
2. Set the applicable software options; see Section 5.3.1
(Procedure overview). This example shows two functions:
Channel 2 (CH2) is set to measure current with 24V loop
power.
Pressure (P1) is set to measure the pressure supplied by
the pressure station.
3. To attach the device under test, use the specified
procedures for your PV 62x pressure station*.
5
K0457 - [EN] English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Druck pv 621Druck pv 623

Table of Contents