FusionCol8000-E400 Modular Indirect Evaporative
Cooling System
User Manual
●
●
Step 4 Follow the onscreen instructions to complete the wizard-based startup.
1.
2.
Issue 04 (2022-06-30)
Tap Yes to execute the wizard-based startup task.
Tap No to exit the wizard-based startup mode.
Figure 6-17 Checking before startup
Select the items that are involved in wizard-based startup (all items are
selected by default when you access the commissioning item selection screen
for the first time) and confirm whether to start the task.
–
Tap Yes to start the system and commission components.
–
Tap No to exit the commissioning while keeping the system shut down.
Figure 6-18 Wizard Startup
NO TE
After commissioning for a component succeeds, the system automatically performs
commissioning for the next component you selected. Please wait during the
commissioning.
Check the commissioning result.
–
If the message "Commissioning succeeded" is displayed in the lower left
corner, tap Confirm. The home screen is displayed.
–
If the message "Commissioning failed" is displayed in the lower left
corner:
i.
Click the link at "Commissioning failed" to view the failure cause, tap
Back and Confirm, and troubleshoot based on the failure cause.
ii.
On the home screen, choose Maint > Wizard Startup and perform
commissioning again.
Copyright © Huawei Technologies Co., Ltd.
6 Power-On and Commissioning
100