FusionModule500 Smart Mini Data Center
User Manual

4.4 Verifying the Installation

Cabinet Installation Check
Table 4-15 Cabinet installation check items
No.
1
2
3
4
5
6
7
8
9
10
Cable Installation Check
Table 4-16 Cable installation check items
No.
1
2
Issue 02 (2020-12-25)
Check That
The cabinet position is consistent with the
equipment room layout diagram.
All bolts are tightened, especially the bolts used
for electric connection. Flat washers and spring
washers are installed properly.
The cabinet is clean and free of dust and other
materials.
The cabinet is clean and complies with dustproof
requirements.
The paint on the cabinet exterior is intact.
Promptly repaint the cabinet exterior if necessary
to prevent corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The cabinet has no waste tape, cable ties, paper,
or packing materials around it.
All components are properly installed and no
component is left onsite.
Block empty cable holes using plugs or lids.
Check That
All cable joints are secured properly, especially the
cable joints between network cables.
Exposed parts near the wiring terminals and lugs
are wrapped in PVC insulation tape or heat
shrinking tubing.
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
Check Result
□ Passed □ Failed
□ Passed □ Failed