Acceptance criteria

Test completion

2000966-542D
Functional and electrical safety checks: BISx (option) current leakage tests
3. Read and record leakage current indicated on the tester.
4. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – CLOSED
5. Read and record leakage current indicated on the tester.
6. Set the power switch on the leakage tester to OFF.
If either reading is greater than 5000 µA, the BISx fails this test. Contact
GE Technical Support.
1. Disconnect the leakage tester from the power outlet.
2. Disconnect all test equipment from the device.
3. Disconnect the device power cord from the leakage tester.