Replacing The Transmission, Internal Motor Mounting - Bosch Rexroth HQ 2/C-H Assembly Instructions Manual

Hide thumbs Also See for Rexroth HQ 2/C-H:
Table of Contents

Advertisement

48/64
Maintenance and repair
Please note:
To replace the transmission,
belt section BS 2/CH-HQ2,
BS 4/C-HQ4 for the
transverse conveyor of the
lift unit must be removed.
Required tools
• Hex socket wrench, size 3
• Hex socket wrench, size 4
• Hex wrench, size 8
• Hex wrench, size 10
• Hex wrench, size 13
Preliminary steps
Allow the belt section to
run briefl y and position
the fl at-top plate with hole
(A, chain coupling position)
on the drive sprocket.
Now deenergize and
depressurize the system,
and secure it against
being reactivated.
1.
Remove the motor.
Bosch Rexroth AG, Material and information fl ow technology: HQ 2/C-H, HQ 4, 3 842 358 792/2016-12
10.4.3

Replacing the transmission, internal motor mounting

4x
1
SW8
M
D
Fig. 29:
Preparation and removing the motor
=20 Nm
1
A
551 261-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth hq 43 842 999 0023 842 998 035

Table of Contents