Huawei FusionCol8000-E240 User Manual page 169

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
Step 7 Secure the new compressor using a solid wrench.
Step 8 Weld the suction inlet and exhaust outlet with the compressor using a welding
torch.
● During welding, use a silver copper welding rod containing 5% silver. Check
that the welding joints are in good condition, without poor welding.
● To avoid burning the internal components, other pipes, thermal insulation
foam, power cables, and labels, take protective measures, such as spreading
wet cloth, around the welding joints.
● Do not use face-down bonding when welding.
Step 9 Install the refrigerant oil heating belt and ground cable for the compressor, install
the cable trough, install the compressor cables, and install the cover.
Ensure that the phase sequence of the compressor input cable is consistent with
that on the compressor label. Otherwise, the compressor may be damaged.
Step 10 Perform a leakage test with nitrogen.
Step 11 After checking that the smart cooling product does not leak, vacuumize the smart
cooling product and fill the refrigerant.
Step 12 Check that the compressor cable phase sequence is correct, power on the device,
and tap Start on the home screen.
Issue 01 (2021-01-30)
Figure 8-21 Removing a compressor
NO TICE
NO TICE
Copyright © Huawei Technologies Co., Ltd.
8 System Maintenance
160

Advertisement

Table of Contents
loading

Table of Contents