D.20 Splitter:
Jumper locations on the D.20 Splitter:
Jumpers
Z5 & Z6
Use jumpers:
Z1 to Z4 for external power setting
Z5 and Z6 for D.20 channel used
Z7 to Z11 for SW base compatibility setting
D.20 Splitter:
The following table gives jumper settings for Z1 to Z11.
Settings
Jumper
Jumper
Jumper
Number
Position
Setting
Z1 to Z4
1 – 4 & 2 –
OUT
3
1 – 4 & 2 –
3
Z5 to Z6
1 – 2
2 – 3
Z7 to Z10
1 – 2
ALL
OUT
Z11
2 – 3
Z7 to Z10
1 – 2
ALL IN
Z11
2 – 3
76
, continued
Z1 to Z4
Option 1
1A 1B 1C
D.20 Link Power Supplies Splitter
IN
External Power on TB1 supplies D.20 Link and Splitter
2A 2B
IN
D.20 Channel 1 Used
IN
D.20 Channel 2 Used
3A 3B
ALL OTHER BASES (DEFAULT)
IN
Base 3.11, Pre-Win or Older
IN
994-0078-2.00-7
Z7 to Z10
Jumper Definition – External Power
Jumper Definition – D.20 Channel Used
Jumper Definition – S/W Base Compatibility