Instructions for fitting connectors, attachments and devices
2.3 Electrical networks
8. To strip the insulation, turn the tool
in the direction of the arrow
approx. 4 times for PVC insulation
approx. 8 times for PUR insulation
11. Spread out the wires according to
the color markings on the terminal
block of the Modular Outlet.
Do not undo the twisting of the wire
more than necessary to make the
connection.
Shorten the two middle pairs so that
all wires end in a line.
14. Align the cable so that the braided
shield is in the center of the middle
section of the shield clamp.
Fold down the upper part.
42
9. Remove the cable jacket, shield
and the white filler with your hand.
12. Guide the wires according to the
color markings, pair by pair into the
wire channels of the insulation
piercing terminals as far as the limit
stop on the back panel. (17.)
The ends of the wires must be
visible in the last viewing window of
the terminal block! (18.)
15. Tighten the two cover screws. (23.)
Tighten the insert screw until the
insert is flush with the casing of the
outlet. (24.)
10. Cut off the central support element.
13. Secure the wires in position by
pressing down the terminals as far
as the limit stop.
Repeat these steps until all four
pairs or wires are connected.
16. Fit the outlet on a DIN rail or secure
it to a smooth surface using the
three holes in the casing.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents