Siemens 6GK1 901-1GB01 System Manual page 15

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

9. Cut back the wires to a length of 15
mm and + 5 mm shield.
14. Contact the wires by pressing down
the cover with a tool or hard object.
15. Push the seal, the sealing ring and
the forcing nut in the direction of the
casing. Tighten the forcing nut in a
clockwise direction.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
Instructions for fitting connectors, attachments and devices
10. Push parts a to d onto the cable in
the order shown.
15. Push the contact holder into the
casing.
Make sure that the contract holder
is in the correct position.
Opening the plug:
1. To open the connector, press back
the catch, for example with a slotted
screwdriver so that the contact
holder can be taken out.
2. Loosen the forcing nut.
2.3 Electrical networks
11. Open the cover of the contact
holder (b).
12. Place the wires in the guide slots
according to the colored markers on
the contact holder.
13. Align the cable so that the shield
lies between the shield clips of the
contact holder.
16. Push the catch onto the casing.
3. Pull back the seal and sealing ring.
Turn and open the forcing nut.
4. Push back the sealing ring, the seal
and the forcing nut.
You can now remove the contact
holder.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents