Prepare The System For A Run - GE AKTAavant Getting Started

Hide thumbs Also See for AKTAavant:
Table of Contents

Advertisement

7 Prepare the system for a run

7 Prepare the system for a run
Introduction
Follow this chapter to perform the necessary preparations of the system before starting
a run.
Contents
This chapter contains the following sections:
Section
7.1 Before you prepare the system
7.2 Prepare the flow path
7.3 Prime buffer inlets and purge System pumps
7.4 Connect a column
7.5 Calibrate the pH monitor
7.6 Prepare the Fraction collector
70
WARNING
Always use appropriate personal protective equipment during
operation and maintenance of ÄKTAavant system.
Getting Started with ÄKTAavant and UNICORN 6 28-9440-69 AB
See page
71
72
78
83
88
90

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Unicorn 6

Table of Contents