10.1 Maintenance program

Introduction
This section describes the preventive maintenance to be performed on ÄKTAavant.
The maintenance is divided into:
Periodic maintenance program
The following periodic maintenance should be performed by the user of ÄKTAavant.
Interval
Daily
Weekly
Weekly
Monthly
Bi-annual
Bi-annual
Getting Started with ÄKTAavant and UNICORN 6 28-9440-69 AB
Daily maintenance
Weekly maintenance
Monthly maintenance
Bi-annual maintenance
Maintenance when required
Maintenance action
Calibrate the pH monitor
Calibrate pressure monitors
Change pump rinsing solution
Check the flow restrictor
Clean the UV flow cell
Replace pH electrode
10 Maintenance
10.1 Maintenance program
131