GE C-PT Installation Manual page 43

Ultrasonic flow transducer
Table of Contents

Advertisement

5.4c The Single-Traverse Method - MCF (cont.)
8. On one of the fixtures, position the transducer block anywhere along the rods, being sure to leave enough room on
either side to easily insert the transducer. To move the block, loosen the red thumbscrews, slide the block to the
desired location and tighten the thumbscrews. Use the pressure bolt as the measuring point for the block. Repeat
for the other fixture.
Note: If you are using a fixture with two transducer blocks, adjust one block as described above and push the unused
block all the way to one side of the rail. Tighten the pressure bolt all the way down on the unused block. This
will act as a reminder to not install the transducer in that block.
9. Center the block over one of the marks on the pipe. Align it such that the pressure bolt on the transducer block is
right over the center of the crossmark.
.
10. Turn the switches on each magnet to the ON position.
C-PT Ultrasonic Flow Transducer Installation Guide
Thumbscrew
Pressure Bolt
Top View
35

Advertisement

Table of Contents
loading

Table of Contents