Boot Up Telegram - Siemens MICROMASTER 420 Operating Instructions Manual

Canopen option module
Hide thumbs Also See for MICROMASTER 420:
Table of Contents

Advertisement

Data transfer using CANopen
SYNC Producer
Producer time
Fig. 3-5
NOTE
After powerup, Node Guarding and SYNC loss detection only become active after
reception of the first Node-Guarding message and/or the first SYNC message.
The Node-Guarding or SYNC loss warning and the displayed LED error condition
will be cleared immediately after the first Node-Guarding message or SYNC
message was received. That means the first SYNC starts SYNC checking and the
first Node-Guard message starts Node-Guarding.
If a Node-Guarding fault or a SYNC loss has caused the inverter to trip, then it is
possible to reset the trip in the inverter via CAN. However, the inverter cannot go
into run as long as a communications error is still present (Node-Guarding, SYNC,
Busoff or Overrun).
3.2.3

Boot up telegram

After the initialization phase, a CANopen slave logs-on with a boot-up telegram.
This telegrams contains the COB-ID 700 plus NODE-ID. The COB-ID can be taken
from the node address of the slave. This allows a CANopen master to know which
slaves are connected to the bus.
NMT Master
Indication
Fig. 3-6
36
Request
SYNC
Request
SYNC monitoring protocol
COB-ID = 700H + Node-ID
Boot up protocol
COB-ID = 80H
L=0
L=0
0
CANopen Option Module
Issue 01/05
SYNC Consumer
Indication
SYNC
Consumer time
Indication
SYNC
Consumer time
SYNC loss Event
NMT Slave
Request
Operating Instructions
6SE6400-5BC00-0BP0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micromaster 440Micromaster 430

Table of Contents