Diagnostics
4.1 Diagnostics via LEDs
LED
Color
Green/
orange
or
red/
orange
DP
PROFIdrive
cyclic
operation
Green
Red
OPT
(OPTION)
Green
Red
RDY and DP
Red
RDY and OPT Orange
308
State
Description, cause
Flashing
Component detection via LED is activated
light
(p0124[0]).
2 Hz
Note:
Both options depend on the LED status when
component recognition is activated via p0124[0] =
1.
Off
Cyclic communication has not (yet) taken place.
Note:
PROFIdrive is ready for communication when the
Control Unit is ready (see LED RDY).
Continuous
Cyclic communication is taking place.
light
Flashing
Full cyclic communication has not yet taken place.
light
Possible causes:
0.5 Hz
The controller is not transferring any setpoints.
During isochronous operation, no global con-
trol (GC) or a faulty global control (GC) is
transferred by the controller.
Flashing
PROFIBUS master is sending wrong parameteri-
light
zation/configuration data
0.5 Hz
Flashing
Cyclic bus communication has been interrupted or
light
could not be established
2 Hz
Off
Electronic power supply is missing or outside
permissible tolerance range.
Component is not ready.
Option board not installed or no associated drive
object has been created.
Continuous
Option board is ready.
light
Flashing
Depends on the option board used.
light
0.5 Hz
Flashing
This component has at least one fault.
light
The Option Board is not ready (e.g. after switching
2 Hz
on).
Flashing
Bus error - communication has been interrupted
light
2 Hz
Flashing
Firmware update in progress for connected Option
light
Board CBE20
0.5 Hz
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5
Remedy
Adapt configuration be-
tween master/controller and
CU
Remedy fault
Check power supply and/or
component
Remedy and acknowledge
fault
Remedy fault