GE L90 Instruction Manual page 364

Line current differential system
Hide thumbs Also See for L90:
Table of Contents

Advertisement

FLEXLOGIC
Operand type
ELEMENT:
Phase undervoltage
ELEMENT:
Synchrophasor
Phasor Measurement
Unit (PMU)
ELEMENT:
Synchrophasor one-
shot
5
ELEMENT:
POTT
(Permissive
overreach transfer
trip)
ELEMENT:
POTT1
(Permissive
overreach transfer
trip ground)
ELEMENT:
Power swing detect
5-178
Operand syntax
PHASE TOC2 to 4
PHASE UV1 PKP
PHASE UV1 OP
PHASE UV1 DPO
PHASE UV1 PKP A
PHASE UV1 PKP B
PHASE UV1 PKP C
PHASE UV1 OP A
PHASE UV1 OP B
PHASE UV1 OP C
PHASE UV1 DPO A
PHASE UV1 DPO B
PHASE UV1 DPO C
PHASE UV2 to 3
PMU Agg 1 SvEng On
PMU 1 CURR TRIGGER
PMU 1 FREQ TRIGGER
PMU 1 POWER TRIGGER
PMU 1 ROCOF TRIGGER
PMU 1 VOLT TRIGGER
PMU 1 TRIGGERED
PMU ONE-SHOT EXPIRED
PMU ONE-SHOT OP
PMU ONE-SHOT PENDING
POTT OP
POTT TX
POTT TX1
POTT TX2
POTT TX3
POTT TX4
POTT TRIP A
POTT TRIP B
POTT TRIP C
POTT TRIP 3P
POTT1 OP
POTT1 TX1
POTT1 TX2
POTT1 TX3
POTT1 TX4
POTT1 TRIP A
POTT1 TRIP B
POTT1 TRIP C
POTT1 TRIP 3P
POWER SWING OUTER
POWER SWING MIDDLE
POWER SWING INNER
POWER SWING BLOCK
POWER SWING TMR2 PKP
POWER SWING TMR3 PKP
POWER SWING TMR4 PKP
POWER SWING TRIP
POWER SWING 50DD
POWER SWING INCOMING
POWER SWING OUTGOING
POWER SWING UN/BLOCK
Operand description
Same set of operands as shown for PHASE TOC1
At least one phase of phase undervoltage 1 has picked up
At least one phase of phase undervoltage 1 has operated
All phases of phase undervoltage 1 have dropped out
Phase A of phase undervoltage 1 has picked up
Phase B of phase undervoltage 1 has picked up
Phase C of phase undervoltage 1 has picked up
Phase A of phase undervoltage 1 has operated
Phase B of phase undervoltage 1 has operated
Phase C of phase undervoltage 1 has operated
Phase A of phase undervoltage 1 has dropped out
Phase B of phase undervoltage 1 has dropped out
Phase C of phase undervoltage 1 has dropped out
Same set of operands as shown for PHASE UV1
SvEng data item in associated control block is on
Overcurrent trigger of phasor measurement unit 1 has operated
Abnormal frequency trigger of phasor measurement unit 1 has operated
Overpower trigger of phasor measurement unit 1 has operated
Rate of change of frequency trigger of phasor measurement unit 1 has
operated
Abnormal voltage trigger of phasor measurement unit 1 has operated
Phasor measurement unit 1 triggered; no events or targets are generated by
this operand
Indicates the one-shot operation has been executed, and the present time is
at least 30 seconds past the scheduled one-shot time
Indicates the one-shot operation and remains asserted for 30 seconds
afterwards
Indicates the one-shot operation is pending; that is, the present time is before
the scheduled one-shot time
Permissive over-reaching transfer trip has operated
Permissive over-reaching transfer trip signal sent
Permissive over-reaching transfer trip asserts transmit bit number 1
Permissive over-reaching transfer trip asserts transmit bit number 2
Permissive over-reaching transfer trip asserts transmit bit number 3
Permissive over-reaching transfer trip asserts transmit bit number 4
Permissive over-reaching transfer trip has operated to trip phase A
Permissive over-reaching transfer trip has operated to trip phase B
Permissive over-reaching transfer trip has operated to trip phase C
Permissive over-reaching transfer trip has operated to trip all three phases
Permissive over-reaching transfer trip ground has operated
Permissive over-reaching transfer trip ground asserts transmit bit number 1
Permissive over-reaching transfer trip ground asserts transmit bit number 2
Permissive over-reaching transfer trip ground asserts transmit bit number 3
Permissive over-reaching transfer trip ground asserts transmit bit number 4
Permissive over-reaching transfer trip ground has operated to trip phase A
Permissive over-reaching transfer trip ground has operated to trip phase B
Permissive over-reaching transfer trip ground has operated to trip phase C
Permissive over-reaching transfer trip ground has operated to trip all three
phases
Positive-sequence impedance in outer characteristic
Positive-sequence impedance in middle characteristic
Positive-sequence impedance in inner characteristic
Power swing blocking element operated
Power swing timer 2 picked up
Power swing timer 3 picked up
Power swing timer 4 picked up
Out-of-step tripping operated
The power swing element detected a disturbance other than power swing
An unstable power swing has been detected (incoming locus)
An unstable power swing has been detected (outgoing locus)
Asserted when power swing is detected and de-asserted when a fault during
power swing occurs
L90 LINE CURRENT DIFFERENTIAL SYSTEM – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents