ABB i-bus KNX Product Manual page 42

Energy actuator se/s 3.16.1
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

ABB i-bus
KNX
Commissioning
Limit: The 4 byte communication object Trigger 2 change limit (Intermediate meter total) is enabled.
Using this communication object, the limit for trigger 2 can be modified.
Note
When Limit is selected, the intermediate meter total must be reset before a renewed start. This is
adjustable via the parameter Reset "Intermediate meter reading total" on trigger 1 (Start)" or via the
separate 1 bit communication object Reset.
If the parameterized limit is achieved, the meter reading is sent on the bus, and the intermediate meter
stops.
The following parameter also appears with the selection Limit:
Duration: The 2 byte communication object Trigger 2 change duration (Intermediate meter total) is en-
abled. Using this communication object, the duration until trigger 2 achieved is set. The following pa-
rameter appears:
"Meter reading" is sent on trigger 2
<−−− NOTE
40 2CDC 505 084 D0203 | SE/S 3.16.1
Hour [0...23]
Options:
0...23
Minute [0...59]
Options:
0...59
Weekday
Options:
Monday...Sunday
every day
The intermediate meter is sent if the parameterized time is received on the communication object
Receive time (General). It is possible to parameterize whether the intermediate meter stops or does
not stop.
Note
The time is only required once per device for all meters.
Limit in Wh [1...120,888,000]
Options:
1...5000...120,888,000
If the parameterized limit is achieved, the meter reading is sent on the bus, and the intermediate
meter stops.
Duration in min [1...65,535]
Options:
1...5...65,535
The meter reading is sent if the parameterized duration has elapsed. It is possible to parameterize
whether the intermediate meter stops or does not stop.