[VII Control]
·7· Defrost Operation Control
(1) Starting the defrost operation
-The defrost cycle starts when the pipe temperature (TH6), in the following table, or below has continuously been detected for
3 minutes after the integrated compressor operation time of 50 minutes have passed.
tlf 10 minutes have passed since compressor start-up or since the completion of defrost operation, forced defrost operation
will start by turning on the forced defrost switch (DIP SW2-7).
tEven if the defrost prohibit timer is set to 90 minutes, the actual defrost prohibit time for the next operation will be 50 minutes
if defrosting took 12 minutes.
tIn the multipJe-outdoor-unit system, all of the outdoor units that are in operation go into the defrost mode simultaneously. The
unites) that is stopped at the time defrost operation starts remains stopped.
TH6
Model
SW3 - 3 OFF
SW3 -3 ON
P72 model
- 10°C [14°F]
- 5°C [23°F]
P96 model
- BOC [1BOF]
- 5°C [23°F]
P120 model
- BOC f1BOF]
- 5°C [23°FJ
(2) Defrost operation
Outdoou unit
Compressor frequency
Model
Compressor frequency
P72 model
60 Hz
P96 model
65 Hz
P120 model
65 Hz
Outdoor unit fan
Stopped
SV1a
ON (open)
SV2
ON (open)
SV5b
ON (open)
21S4a
OFF
SV9
OFF (closed)
Be controller
LEV1
G type: 4000, GA type: 6000
LEV3
G type: 1000, GA type: 2000
GB, HB type: 60 (full closed)
SVM1
ON
SVM2
OFF
SV.S
OFF
SV.A
Ports that are connected to the indoor units in cooling Thermo-ON
Other ports: OFF