Sharp 13VT-K100 Service Manual page 37

Tv/vcr combination
Table of Contents

Advertisement

INSTALLING THE SHIFTER
Capstan
D.D. motor
Reel pulley
(Bottom side of mechanism chassis)
Figure 1-42.
Drum
Insert
point 3
Insert
point 2
Rotation
point 2
Shaft 1
Phase-matching
point 1
Figure 1-43.
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see
the point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Phase-Matching
point 2
Loading gear (T)
Round mark
Sifter
Shaft 1
Half round notch
Insert
point 4
Shaft 1
Shaft 4
Release
point 3
37
13VT-K100/150
13VT-CK10
Insert
point 1
Insert
point 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

13vt-ck1013vt-k150

Table of Contents