Sharp 13VT-K100 Service Manual page 35

Tv/vcr combination
Table of Contents

Advertisement

REPLACING THE UPPER AND LOWER DRUM
ASSEMBLY
• Replacement (Perform in the numerical order)
1 Remove the motor as stated in Page 34 D.D. motor
replacement.
2 Remove the drum earth brush 2.
3 Remove the drum base 3 from the upper and lower
drum assembly 1.
[Cares when replacing the drum]
1. Be careful so that the drum earth brush is not lost.
2. Do not touch directly the drum surface.
3. Fit gently the screwdriver to the screws.
4. Since the drum assembly is an extremely precise
assembly, it must be handled with utmost care.
5. Make sure that the drum surface is free from dust, dirt
and foreign substances.
6. After replacing the drum be sure to perform the tape
running adjustment.
After that, perform also the electrical adjustment.
• Playback switching point adjustment
• X-position adjustment and check
7. After replacing the drum clean the drum.
2
1
Figure 1-39.
ASSEMBLING OF PHASE MATCHING
MECHANISM COMPONENTS
• Assemble the phase matching mechanism com-
1. Assemble the pinch roller assembly and pinch drive
2. Mounting the shifter (on the back of the mechanism
3. Mounting the master cam (on the back of the mecha-
4. Assemble the connection gear, slow brake and load-
• Pinch drive cam and pinch roller
(Place the following parts in position in numerical
(1)Reverse drive lever 1
(2)Reverse guide spring 2
(3)Reverse guide lever ass'y 3
(4)Reverse guide height adjusting nut 4
(5)Pinch drive cam 5
(6)Pinch roller ass'y 6
(7)Open lever 7
3
35
ponents in the following order.
cam.
chassis).
nism chassis).
ing motor parts.
assembling method.
order.)
Figure 1-40.
13VT-K100/150
13VT-CK10
7
6
4
3
2
1
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

13vt-ck1013vt-k150

Table of Contents