Huawei SmartACU2000D User Manual
Huawei SmartACU2000D User Manual

Huawei SmartACU2000D User Manual

Smart array controller
Hide thumbs Also See for SmartACU2000D:
Table of Contents

Advertisement

Quick Links

SmartACU2000D Smart Array Controller
User Manual (with No PID Module)
Issue
05
Date
2023-09-26
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartACU2000D and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei SmartACU2000D

  • Page 1 SmartACU2000D Smart Array Controller User Manual (with No PID Module) Issue Date 2023-09-26 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the SmartACU2000D smart array controller (SACU for short), which is an outdoor cabinet, in terms of its installation, electrical connections, commissioning, and maintenance. Before installing and operating an SACU, closely read this manual to get familiar with the functions and features of the device as well as the precautions.
  • Page 4 4.2 Unpacking and Acceptance. Updated Tools. Issue 02 (2020-08-18) Added A Scenario Where a Longitudinal Encryption Device Is Used. Issue 01 (2020-02-14) This issue is used for first office application (FOA). Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    4.5.1 Wall-mounted Installation............................. 42 4.5.2 Support-mounted Installation............................44 4.5.3 Pole-mounted Installation.............................. 47 4.6 Installing the Components..............................49 4.6.1 Opening the Main Cabinet Door..........................50 4.6.2 (Optional) Installing the SmartModule........................50 4.6.3 (Optional) Installing the Ethernet Switch.........................51 Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 6 7.3.7 Replacing the Power Adapter............................89 7.3.8 Replacing the Fiber Adapter............................90 7.3.9 Replacing the USB Port..............................91 8 Technical Specifications....................... 92 A Scenario Where a Longitudinal Encryption Device Is Used........94 Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 7 SmartACU2000D Smart Array Controller User Manual (with No PID Module) Contents B Acronyms and Abbreviations....................97 Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 8: Safety Information

    The equipment is damaged due to force majeure such as earthquakes, floods, volcanic eruptions, debris flows, lightning strikes, fires, wars, armed conflicts, typhoons, hurricanes, tornadoes, and other extreme weather conditions. ● The equipment is operated beyond the conditions specified in this document. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 9: Personal Safety

    D ANGER During operations, use dedicated insulated tools to prevent electric shocks or short circuits. The dielectric withstanding voltage level must comply with local laws, regulations, standards, and specifications. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 10 Professionals: personnel who are familiar with the working principles and structure of the equipment, trained or experienced in equipment operations and are clear of the sources and degree of various potential hazards in equipment installation, operation, maintenance Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 11: Electrical Safety

    WARNING For the equipment that needs to be grounded, install the ground cable first when installing the equipment and remove the ground cable last when removing the equipment. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 12 ● Only qualified professionals can replace a damaged cable. ● Do not scrawl, damage, or block any labels or nameplates on the equipment. Promptly replace labels that have worn out. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 13 0°C. Handle cables with caution, especially at a low temperature. – Cables stored at subzero temperatures must be stored at room temperature for at least 24 hours before they are laid out. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 14: Environment Requirements

    ● Keep the installation and operating environments of the equipment within the allowed ranges. Otherwise, its performance and safety will be compromised. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 15 All cable holes must be sealed. Seal the used cable holes with sealing putty. Seal the unused cable holes with the caps delivered with the equipment. The following figure shows the criteria for correct sealing with sealing putty. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 16: Mechanical Safety

    Do not drill holes into the equipment. Doing so may affect the sealing performance and electromagnetic containment of the equipment and damage components or cables inside. Metal shavings from drilling may short-circuit boards inside the equipment. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 17 When transferring a heavy object, move your feet instead of turning your waist around. When lifting and transferring a heavy object, ensure that your feet point to the target direction of movement. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 18 When climbing up the ladder, keep your body stable and your center of gravity between the side rails, and do not overreach to the sides. ● When a step ladder is used, ensure that the pull ropes are secured. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 19 To avoid short circuits or other risks, do not drill holes into buried pipes or cables. ● When drilling holes, protect the equipment from shavings. After drilling, clean up any shavings. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 20: Overview

    D: version D Voltage level D: ≤ 800 V three-phase AC input Configuration ● 00: one MBUS route ● 02: two MBUS routes ● 05CN: one MBUS route and 4G antenna Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Product Introduction

    User Manual (with No PID Module) 2 Overview Model Identification You can view the SACU model on its nameplate. Figure 2-2 Nameplate (SmartACU2000D-D-00 as an example) (1) Trademark and model (2) Key technical specifications (3) Compliance symbols (4) Company name and country of origin NO TE The nameplate figure is for reference only.
  • Page 22 ● Stable and reliable: Has a built-in surge protection module. The industrial application is secure and reliable. Networking Figure 2-3 Networking of the SmartACU2000D-D-00 or SmartACU2000D-D-02 ● Wired network: fiber ring network solution Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 23 Wireless network: 4G LTE solution NO TE The IP address of the SmartLogger and that of the customer-premises equipment (CPE) must be on the same network segment. Figure 2-4 Networking of the SmartACU2000D-D-05CN Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Appearance

    2.3.1 Product Appearance Appearance Figure 2-5 Appearance Component Description Cabinet door Mounting plate Waterproof connector for the ● Specifications: 3/4 in. protective earthing cable ● Inner diameter: 13–18 mm (PE) (0.51–0.71 in.) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 25 (SFP1) ● Inner diameter: 13–18 mm (0.51–0.71 in.) Waterproof connector for the ● Specifications: 3/4 in. optical cable, network cable, ● Inner diameter: 13–18 mm or 4G antenna (SFP2/4G LTE/4G) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 26: Enclosure Signs

    Do not connect a three- cable connection phase input power cable to a single-phase input switch. Do not connect a single-phase input power cable to a three-phase input switch. Otherwise, the device will be damaged. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 27: Product Composition

    Figure 2-7 SmartACU2000D-D-02 Components Table 2-2 Components and reserved installation positions Name Specifications Quantity Power adapter of the ● AC input: 100–240 V, 50 Hz/60 Hz SmartLogger (U01) ● DC output: 12 V/2 A Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 28 (PoE) module Position for the PoE module (POE) ATB (Access Terminal Box) Single-phase input switch 32 A/2P (QF03) Three-phase input switch 25 A/3P 2 (FU02) Three-phase input switch 25 A/3P 1 (FU01) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 29 2.5 (or 18–14 AWG) Position for the SmartModule1000A01 (SmartModule) Protective earthing (PE) Figure 2-8 SmartACU2000D-D-00 and SmartACU2000D-D-05CN Components Table 2-3 Components and reserved installation positions Name Specifications Quantity Power adapter of the ● AC input: 100–240 V, 50 Hz/60 Hz SmartLogger (U01) ●...
  • Page 30 32 A/2P (QF03) Three-phase input switch 25 A/3P (FU01) RS485 communications 12P; supports the wires with a cross- terminal (JX01) sectional area ranging from 1 mm to 2.5 (or 18–14 AWG) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 31: Working Principles

    WebUI of the SmartLogger3000, choose Monitoring > MBUS > Network Settings, and set Networking to Enable (default value). When the SACU communicates with the inverters SmartLogger3000 User over RS485, set Networking to Disable. For details, see the Manual . ● RS485 communication mode Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 32 MBUS CCO module, and other devices that support RS485 communication over COM ports. NO TE The figure displays only major components and cables, and is for reference only. ● MBUS communication mode Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 33 CCO module connects to the inverters that support MBUS communication over the three-phase AC power cable. NO TE ● The MBUS CCO module is available only for the SmartACU2000D-D-02. ● The figure displays only major components and cables, and is for reference only.
  • Page 34: Configuration In Different Scenarios

    The SmartLogger communicates with the cloud server over a 4G wireless network. 2.6 Configuration in Different Scenarios 2.6.1 Fiber Ring Network NO TE Only the SmartACU2000D-D-00 and SmartACU2000D-D-02 are applicable to this scenario. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 35 Componen Quantity Specifications t Source (Optional) SmartModule1000A01 Purchased SACU SmartModule from Huawei (Optional) Ethernet UT-H605 or ES1000 switch (Optional) 24 V power supply Fitting bag Optical for optical module ring switching Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 36 (FC) switch. NO TE ● Components listed in the table need to be installed onsite. ● Models of the components inside the transformer station are specified by the transformer station vendor. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 37 V DC output armored copper cable power cable ● Connection through a tube: single-core ● 14–12 AWG (14 outdoor copper cable AWG) ● Operating voltage to the ground ≥ 300 V Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 38: Lte

    User Manual (with No PID Module) 2 Overview 2.6.2 4G LTE NO TE Only the SmartACU2000D-D-00 and SmartACU2000D-D-02 are applicable to this scenario. Figure 2-13 Networking diagram NO TE Components in dashed-line boxes are optional. To highlight the involved area, the figure does not show all factory-installed components and cables.
  • Page 39 Note a: If the CPE model is EG860, a PoE SPD is required. NO TE ● Components listed in the table need to be installed onsite. ● Models of the components inside the transformer station are specified by the transformer station vendor. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 40 ● 10–6 AWG (6 AWG) Network 20 m (65.62 ft) long network cable cable from delivered with the Huawei CPE (If the the PoE cable is not long enough, prepare a Cat module or 5e outdoor shielded network cable with...
  • Page 41 ● Operating voltage to the ground ≥ 300 V 2.6.3 4G NO TE Only the SmartACU2000D-D-05CN is applicable to this scenario. Figure 2-14 Networking diagram Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 42 ● Recommended rated current of the fuse: 32 A; rated current of the knife fuse switch box: ≥ 32 A; number of poles: 3 (three fuses for each knife fuse switch box) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 43 ● 4–6 mm (4 mm power cable armored copper cable ● 12–10 AWG (12 ● Connection through a tube: single-core AWG) outdoor copper cable ● Operating voltage to the ground ≥ 300 Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 44 ● 2.5–4 mm (2.5 DC output armored copper cable power cable ● Connection through a tube: single-core ● 14–12 AWG (14 outdoor copper cable AWG) ● Operating voltage to the ground ≥ 300 Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 45: Storage Requirements

    If the SACU has been stored for a long time, it needs to be inspected by professionals before it is put into use. The Company shall not be liable for any consequence caused by violation of the storage requirements specified in this document. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 46: System Installation

    Move the equipment with caution to avoid bumping or falling, which may damage the equipment. ● After placing the equipment in the installation position, unpack it with care to prevent scratches. Keep the equipment stable during unpacking. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 47: Tools

    Torque wrench Open end: 32 mm Rubber mallet Crimping tool Cable cutter Utility knife RJ45 crimping tool Network cable SPD extracting Multimeter tester tool Heat shrink tubing Heat gun Vacuum cleaner Marker Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 48: Installation Requirements

    Cable tie Steel measuring Adjustable torque tape wrench Personal protective equipment (PPE) Insulated gloves Protective gloves Goggles Dust mask Safety helmet Reflective vest Insulated shoes 4.4 Installation Requirements Figure 4-1 Installation requirements Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 49: Installing The Cabinet

    For details, see Figure 4-2. Level the marking-off template using a level, and mark mounting holes using a marker. Step 2 Drill holes using a hammer drill and install expansion bolts. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 50 Step 3 Assign two persons to lift the cabinet and mount it on the bolts, and assign another person to assist. Step 4 Tighten the bolts using a torque wrench with the open end of 18 mm (0.71 in.). Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 51: Support-Mounted Installation

    Step 1 Determine the positions for drilling holes into the support based on the delivered marking-off template. For details, see Figure 4-2. Level the marking-off template using a level, and mark mounting holes using a marker. Step 2 Drill holes using a hammer drill. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 52 Step 3 Insert the M12x40 bolt assemblies delivered with the cabinet into the holes, and secure them using the supplied nuts and flat washers. NO TE Do not fully tighten the bolts. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 53 Step 4 Assign two persons to lift the cabinet and mount it on the bolts, and assign another person to assist. Step 5 Tighten the bolts using a torque wrench with the open end of 18 mm (0.71 in.). Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 54: Pole-Mounted Installation

    Step 1 Secure the pole-mounting brackets to the pole and tighten the U-shaped bolts to a torque of 45 N·m using a torque wrench with the open end of 18 mm (0.71 in.). Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 55 SmartACU2000D Smart Array Controller User Manual (with No PID Module) 4 System Installation Figure 4-8 Securing pole-mounting brackets Step 2 Secure the SACU to the pole-mounting brackets. For detailed operations, see 4.5.2 Support-mounted Installation. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 56: Installing The Components

    SmartACU2000D Smart Array Controller User Manual (with No PID Module) 4 System Installation Figure 4-9 Securing a cabinet ----End 4.6 Installing the Components Install the components based on 2.6 Configuration in Different Scenarios. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 57: Opening The Main Cabinet Door

    Step 2 Remove the panel at the position where the SmartModule is to be installed from the cabinet and take out the mounting kit. Step 3 Secure the mounting bracket to the SmartModule. Step 4 Install the SmartModule. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 58: Optional) Installing The Ethernet Switch

    4.6.3 (Optional) Installing the Ethernet Switch Step 1 Remove the panel behind which an Ethernet switch will be installed. Step 2 Secure the Ethernet switch. Step 3 Connect a PE cable to the Ethernet switch. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 59 Ethernet switch. Step 5 Connect the preinstalled power cable to the power port on the Ethernet switch based on the label. Figure 4-14 Connecting an Ethernet switch cable ----End Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 60: Optional) Installing The 24 V Power Module

    Step 3 Place the PoE module at the installation position and align the mounting holes. Then secure the PoE module. NO TE Indicators should be in the lower left corner. Step 4 Secure the mounting board. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 61: Optional) Installing The Poe Spd

    Step 4 Place the PoE SPD in the mounting bracket. Ensure that the PE point faces upwards and the surface marked PE faces outwards. Step 5 Secure the PoE SPD fastener. Step 6 Connect the other end of the ground cable to the PE bar. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 62: Installing The Sim Card And 4G Antenna

    Step 2 Take the SmartLogger out of the installation position. Step 3 Install the SIM card, reinstall the SmartLogger, and secure the SmartLogger. Step 4 Reconnect the cables based on the labels. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 63 Step 1 Remove the 4G antenna bound inside the cabinet. Step 2 Install the 4G antenna on the cabinet. Step 3 Connect the cable to the 4G port on the SmartLogger. Figure 4-19 Installing a 4G antenna ----End Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 64: Electrical Connections

    ● The cable colors shown in the electrical connection diagrams provided in this chapter are for reference only. Select cables in accordance with local cable specifications (green-and-yellow cables are only used for protective earthing). Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 65: Selecting A Connection Mode

    Step 5 Clear foreign matter from the cabinet. ----End 5.1.2 Connection Through a Tube If you choose connection through a tube, ensure that an appropriate cable and a tube are available. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 66 Figure 5-3 Installing a tube fitting Step 3 Route the cable through the tube conduit and then the fitting, and connect the cable. Step 4 Secure the fitting to the conduit. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 67: Crimping The Ot Terminal

    ● Wrap the wire crimping area with heat shrink tubing or insulation tape. The heat shrink tubing is used as an example. ● Use a heat gun carefully to avoid heat damage to the equipment. Figure 5-4 Crimping an OT terminal Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 68: Connecting The Pe Cable

    ● To enhance the corrosion resistance of a ground terminal, you are advised to apply silica gel or paint on it after connecting the ground cable. Figure 5-5 Connecting a PE cable Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 69: Connecting The Communications Cables For The Fiber Ring Network

    Connecting the Cables to the ATB NO TICE ● As optical cables are hard, prepare optical cables before routing them into the SACU. ● Only professionals are allowed to connect optical cables. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 70 Figure 5-7 ATB interior (1) Fiber spool (2) Fixing points for internal (3) Cable clip steel wires of optical cables Step 1 Remove the external mechanical parts from the ATB. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 71 ATB, and connect the cable to the ATB. Step 5 Connect the peripheral optical cable to the ATB, splice the optical cable and the optical jumper, and wind the spliced cable around the fiber spool on the ATB. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 72: Connecting The 4G Lte Cable (With A Poe Spd)

    Step 1 Connect the POE port on the PoE module to the PROTECT port on the PoE SPD using the network cable delivered with the PoE SPD. Figure 5-11 Connecting a PoE module to a PoE SPD Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 73 Step 3 Connect the factory-installed power cable on the SmartLogger to the PoE module. Figure 5-12 Connecting cables to the PoE module Step 4 Connect the network cable delivered with the CPE to the Surge port on the PoE SPD. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 74: Connecting The 4G Lte Cable (Without A Poe Spd)

    Step 1 Connect the factory-installed network cable on the SmartLogger to the DATA port on the PoE module. Step 2 Connect the factory-installed power cable on the SmartLogger to the PoE module. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 75: Connecting The Three-Phase Ac Power Cable

    AC power cable of the second route to the FU02 switch. ● This section describes how to connect the three-phase AC power cable for the SACU that supports the access of two MBUS routes. For details about the Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 76 A, B, and C on the transformer station busbar 2 over a three-phase power switch. ● Ensure that the L1, L2, and L3 wires are connected in correct phase sequence. Step 3 Bind the cable. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 77: Connecting The Peripheral Rs485 Communications Cables

    RS485 communications cables are connected in the same way. This section describes how to connect two RS485 communications cables. Table 5-1 Definition of the JX01 terminal block Port on the JX01 Definition Terminal Block RS485-1 (+) RS485A, RS485 differential signal+ Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 78 Step 2 Connect the communications cable to the JX01 terminal block. Step 3 Crimp an OT terminal on the shield layer, and connect the shield layer to the cabinet ground point. Step 4 Bind the communications cable. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 79: Optional) Connecting The Peripheral Network Cable

    Verify that the network cable functions properly using a network cable tester. Step 2 Connect the peripheral network cable to the FE2 port on the Ethernet switch. Step 3 Bind the network cable. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Optional) Connecting The Dc Output Power Cable To The 24 V Power Module

    Step 1 Prepare a cable. Figure 5-22 Length for cable stripping Step 2 Connect the cable to the 24V OUT+ and 24V OUT- ports on the power module. Step 3 Bind the cable. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 81: Connecting The Single-Phase Power Cable

    Connect the L and N (L) wires to the L and N (L) terminals of the station-service power source for the transformer station through an MCB. Step 3 Bind the cable. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 82: Connecting Do/Di/Ai Cables

    The SACU reserves the waterproof connectors for the, DO, DI, and AI cables. Cabling routes are provided for the signal cables. For details about how to prepare and connect the cables, see the SmartLogger3000 User Manual . Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 83 SmartACU2000D Smart Array Controller User Manual (with No PID Module) 5 Electrical Connections Figure 5-26 Cabling routes Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 84: System Commissioning

    The cabinet interior is clean, without dust, dirt, or foreign matter. The paint on the cabinet exterior is intact. If paint flakes off, repaint that area to prevent corrosion. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 85: Powering On The System

    If the SACU supports the access of two MBUS routes, turn on the FU01 and FU02 switches. ----End 6.3 Closing the Cabinet Door Retract the support bar, close the cabinet door, and tighten the screws. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 86: Powering Off The System

    If the SACU supports the access of one MBUS route, turn off the FU01 switch. ● If the SACU supports the access of two MBUS routes, turn off the FU01 and FU02 switches. ----End Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 87: System Maintenance

    ● There is no dust or dirt in the SACU. System running ● All devices in the SACU operate properly. Once every six status months ● The SPD works properly. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 88: Troubleshooting

    2. Replace the power adapter disconnected. or 24 V DC power module. 2. The power adapter or 24 V DC power module is faulty. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 89 If not, set the IP address again. 4. Connect the PC to the Ethernet switch and ping the IP address of the SmartLogger. If the communication is abnormal, replace the network cable and try again. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 90: Component Replacement

    ● If an SPD is damaged or its indication window is displayed in red, replace the SPD. ● A single-phase SPD is replaced in the same way as a three-phase SPD. This section describes how to replace a single-phase SPD. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 91: Replacing The Knife Fuse Switch

    Figure 7-2 Installing a new surge protection module ----End 7.3.2 Replacing the Knife Fuse Switch Step 1 Disconnect the cables from the knife fuse switch and label the cables. Step 2 Remove the faulty knife fuse switch. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 92: Replacing The Fuse Of A Knife Fuse Switch

    Step 4 Connect the cables based on their labels. ----End 7.3.3 Replacing the Fuse of a Knife Fuse Switch Step 1 Open the knife fuse switch box and remove the faulty fuse. Figure 7-4 Removing a faulty fuse Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 93: Replacing The Single-Phase Input Switch

    7.3.5 Replacing the SmartMBUS CCO Module Step 1 Disconnect the cables from the SmartMBUS CCO module and label the cables. Step 2 Remove the faulty SmartMBUS CCO module and its mounting ears. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 94: Replacing The Smartlogger

    Step 5 Connect the cables based on their labels. ----End 7.3.6 Replacing the SmartLogger Step 1 Disconnect the cables from the SmartLogger and label the cables. Step 2 Remove the faulty SmartLogger and its cabinet-mounting bracket. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 95 User Manual (with No PID Module) 7 System Maintenance Figure 7-7 Removing a faulty SmartLogger Step 3 Remove the mounting ears and guide rail–mounting bracket from a new SmartLogger, and install the cabinet-mounting bracket. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 96: Replacing The Power Adapter

    Step 5 Connect the cables based on their labels. ----End 7.3.7 Replacing the Power Adapter Step 1 Disconnect the cables from the power adapter and label the cables. Step 2 Remove the faulty power adapter. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 97: Replacing The Fiber Adapter

    Step 1 Disconnect the cables from the fiber adapter and label the cables. Step 2 Remove the faulty fiber adapter. Figure 7-10 Removing a fiber adapter Step 3 Install a new fiber adapter. Step 4 Connect the cables based on their labels. ----End Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 98: Replacing The Usb Port

    Figure 7-11 Removing a USB port Step 3 Install a new USB port. Ensure that the rubber ring is on the inner side of the cabinet. Step 4 Connect the cables based on their labels. ----End Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 99: Technical Specifications

    Operation and Operated and maintained from the front maintenance mode Operating Indoor and outdoor environment Maximum 4000 m (13123.36 ft) operating altitude Installation Installed on a support, pole, or wall mode Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 100 –40°C to +60°C (–40°F to +140°F) temperature Storage –40°C to +70°C (–40°F to +158°F) temperature Note a: Supports a 24 V power system. DC input and output: 24–28 V DC; 70 W (maximum) Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 101: A Scenario Where A Longitudinal Encryption Device Is Used

    ● The longitudinal encryption device, fiber ring network switch, and auxiliary power supply are prepared by the customer based on actual requirements. Huawei device faults caused by any of the three components are not covered by the warranty. ● For details about the installation method and cable specifications, see the installation guide of the components.
  • Page 102 This document provides only the recommended cable routing solution for the longitudinal encryption device, fiber ring network switch, and auxiliary power supply. For details about the cable specifications, see the installation guide of the purchased components. Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 103 SmartACU2000D Smart Array Controller A Scenario Where a Longitudinal Encryption Device User Manual (with No PID Module) Is Used Figure A-2 Installation position and cable routing Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 104 CAT 5E Category 5 enhanced central controller customer-premises equipment direct current digital input digital output environmental monitoring instrument Ethernet Long Term Evolution MBUS monitoring bus Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.
  • Page 105 SmartACU2000D Smart Array Controller User Manual (with No PID Module) B Acronyms and Abbreviations protective earthing power over Ethernet relative humidity small form-factor pluggable surge protective device WEEE waste electrical and electronic equipment Issue 05 (2023-09-26) Copyright © Huawei Technologies Co., Ltd.

Table of Contents