SmartACU2000D Smart Array Controller
Quick Guide (with PID Modules)
Issue: 04
Part Number: 31500BWC
Date: 2023-05-09
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei SmartACU2000D

  • Page 1 SmartACU2000D Smart Array Controller Quick Guide (with PID Modules) Issue: 04 Part Number: 31500BWC Date: 2023-05-09 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Overview

    The product warranty does not cover equipment damage caused by failure to follow the storage, transportation, installation, and usage guidelines specified in this document and the user manual. Log in to the technical support website (https://support.huawei.com/enterprise) to view the user manual and safety precautions. •...
  • Page 3 (1) PID cabinet door (2) Main cabinet door (3) Mounting plate (4) Mounting bracket (5) Waterproof connectors for the PID DO signal (6) Waterproof connectors for the RS485 cable (PID01_DO, PID02_DO, 3/4 in.) communications cable and network cable (RS485/ETH, 3/4 in.) (7) Waterproof connectors for the RS485 (8) Waterproof connector for the DO signal communications cable, network cable, and...
  • Page 4 SmartACU2000D-D-03 Components For simplicity purposes, the following figure shows only the components that you need to operate and reserved installation positions. (1) PID functional earthing (FE) bar (FE01, (2) SmartLogger power adapter (U01) FE02) (3) Position for the 24 V DC power module...
  • Page 5 SmartACU2000D-D-01 Components For simplicity purposes, the following figure shows only the components that you need to operate and reserved installation positions. (1) PID FE bar (FE01, FE02) (2) SmartLogger power adapter (U01) (3) Position for the 24 V DC power module (U02)
  • Page 6 Components in dashed-line boxes are optional. To highlight the involved area, the figure does not show all factory-installed components and cables. The SmartModule is installed on the SmartACU2000D-D-03 before delivery, and you do not • need to perform any operations on the SmartModule. If RS485 ports are required for the...
  • Page 7 The following table describes the components to be configured in the fiber ring network scenario. Recommended Model or Component Position Component Quantity Specifications Source Purchased from (Optional) SmartModule1000A01 Huawei SmartModule (Optional) Ethernet UT-H605 or ES1000 switch Smart array (Optional) 24 V controller power supply Purchased from Huawei Optical...
  • Page 8 The following table describes the cables to be prepared by yourself in the fiber ring network scenario. Cross-sectional Area Cable Recommended Model or Specifications Range of the Cable (Recommended Value) • Four-core (L1, L2, L3, and FE) outdoor armored copper cable and OT-M4 terminals (FE) •...
  • Page 9 • The SmartModule is installed on the SmartACU2000D-D-03 before delivery, and you do not need to perform any operations on the SmartModule. If RS485 ports are required for the SmartACU2000D-D-01, the SmartModule can be optionally installed.
  • Page 10 Specifications (Optional) SmartModule1000A01 SmartModule Smart array (Optional) 24 V power controller supply Fitting bags Purchased from module for the PoE Huawei Outside the module and smart array customer- controller premises equipment transformer (CPE) station Recommended rated current: 32 A; number of poles: 2 •...
  • Page 11 • 10–6 AWG (6 AWG) A 20 m (65.62 ft) long network cable delivered with Huawei CPE (If the Network cable from the length is insufficient, prepare a cable PoE module to the CPE with the same specifications as a peripheral network cable.)
  • Page 12: Installing The Cabinet

    Installing the Cabinet Preparations Installation Dimensions Bolts • When the cabinet is installed on a wall, you need to prepare M12x60 stainless steel exploded expansion bolts. • When the cabinet is installed on a support or a pole, use the M12x40 bolt assemblies delivered with the cabinet.
  • Page 13: Support-Mounted Installation

    2. Install expansion bolts. 3. Secure the mounting bracket. Support-mounted Installation 1. Mark hole positions. 2. Drill holes. (You are advised to 3. Secure the mounting apply anti-rust paint to the bracket. holes.) Pole-mounted Installation • If you need to pole-mount the smart array controller, prepare pole mounting brackets based on the dimensions of the smart array controller.
  • Page 14: Installing Components

    Securing the Cabinet 1. Install the cabinet on the mounting 2. Remove the security torx wrench bound to bracket. the cabinet base and use the wrench to tighten security torx screws. Opening the Main Cabinet Door • Before opening the main cabinet door, turn off all upstream switches for the smart array controller to power off the controller.
  • Page 15 Installing the PoE Module 1. Loosen screws and remove the mounting board. Do not remove the screws. 2. Remove screws from the PoE module installation position. 3. Secure the PoE module. (The indicators should be in the lower left corner). 4.
  • Page 16 5. Connect the GE4 port on the SmartModule to the LAN port on the SmartLogger using the network cable delivered with the SmartModule. 6. Connect the preinstalled RS485 cable to the COM port on the SmartModule based on the label. 7.
  • Page 17 4. Connect the FE1 port on the Ethernet switch to the WAN port on the SmartLogger using the network cable delivered with the Ethernet switch. 5. Connect the preinstalled power cable to the power port on the Ethernet switch based on the label. (Optional) Installing the 24 V Power Module 1.
  • Page 18: Connecting Cables

    Connecting Cables Connect cables in accordance with the installation laws and regulations of the country or region where the project is located. Selecting a Connection Method You can connect a peripheral cable to the smart array controller in common mode or through a tube based on site requirements.
  • Page 19 1. Remove the locking cap and plug from the waterproof connector, and then remove the waterproof connector. 2. Secure the tube fitting using the nut provided with the tube. 3. Route the cable through the conduit and then the fitting. 4.
  • Page 20 Connecting the PE Cable 1. Crimp an OT terminal. 2. Secure the PE cable. • Connect the PE cable to the nearest ground point or the ground bar in the transformer station. • To enhance the corrosion resistance of the ground terminal, you are advised to apply silica gel or paint on it after connecting the PE cable.
  • Page 21 5. Connect one end of the optical jumper to the fiber adapter. 6. Route the other end of the optical jumper through the cable hole on the side of the ATB, and then connect the cable to the ATB. 7. Connect the peripheral optical cable to the ATB, splice the optical cable and the optical jumper, and then wind the spliced cable around the...
  • Page 22 1. Prepare a cable. 2. Crimp an OT terminal. 3. Connect the L1, L2, and L3 wires to the three-phase input switch. Connect the FE cable to the FE bar. • Connect the L1-1, L2-1, and L3-1 wires from the FU01 switch respectively to ports A, B, and C on the transformer station busbar 1 over a three-phase power switch.
  • Page 23 RS485-3 port (ports 5 and 6 on the JX01 terminal block) because the communications cable of the MBUS CCO module has been connected to this port. JX01 ports 7, 8, 9, 10, 11, and 12 on the SmartACU2000D-D-03 can be connected to the RS485 •...
  • Page 24 (Optional) Connecting the Peripheral Network Cable Connect peripheral network cables to ports FE2–FE5 on the Ethernet switch. All network cables are connected in the same way. This section describes how to connect one network cable. 1. Prepare a network cable. IS01Z00009 (1) White- (3) White-and-...
  • Page 25: Verifying The Installation

    6.11 Connecting the Single-Phase AC Power Cable 1. Prepare a cable. 2. Connect the cable to the single-phase input switch. Connect the L and N (L) wires to the L and N (L) terminals of the station-service power source for the transformer station through an MCB.
  • Page 26 Ensure that the power voltage of the smart array controller is within the operating voltage range, and the three-phase input voltage is within the MBUS/PID module operating voltage range. 1. Turn on the single-phase power switch that controls the power supply from the remote transformer station to the smart array controller.
  • Page 27 SmartLogger Device Monitoring PID Function Menu Home Screen Running Parameter Descriptions Parameter Function Value Description • PV– positive offset refers to raising the voltage between PV– and the ground to above 0 V through voltage compensation. PV– • Select PV– positive offset for P-type PV modules or positive the N-type PV modules that comprise the solar cells offset...
  • Page 28 • To highlight the key points, only the parameters that need to be set are described. • If a smart array controller with two PID modules is used in the scenario with a dual-split transformer and the solar inverter configurations are the same, you are advised to set the operating parameters of both PID modules to the same.
  • Page 29 The longitudinal encryption device, fiber ring network switch, and auxiliary power supply are • prepared by the customer based on actual requirements. Huawei device faults caused by any of the three components are not covered by the warranty. For details about the installation method and cable specifications, see the installation guide •...
  • Page 30 This document provides only the recommended cable routing solution for the longitudinal encryption device, fiber ring network switch, and auxiliary power supply. For details about the cable specifications, see the installation guide of the purchased components.
  • Page 31 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129, People's Republic of China e.huawei.com...