Confirmation From Master Station Plc - Yamaha CC-Link RCX Series Owner's Manual

Robot controller
Table of Contents

Advertisement

3. Troubleshooting
4
6
4-
3.4

Confirmation from master station PLC

[Confirmation item 1]
<Confirmation details>
• Using the master station PLC's line test function, confirm robot controller is correctly
connected to the CC-Link system.
* Refer to the master station PLC instruction manual for details on the line test.
[Confirmation item 2]
<Confirmation details>
• Using the master station PLC's line test function, check whether an error has oc-
curred in the robot controller's CC-Link connection.
<Cause>
• The ferrite core for noise measures is not connected.
• The CC-Link cable is laid near sources of noise such as the power cable.
<Countermeasures>
• Connect the ferrite core for noise measures onto the input power cable.
• Wire the CC-Link cable away from noise sources such as the power cable.
Get other manuals https://www.bkmanuals.com

Advertisement

Table of Contents
loading

Table of Contents