Husqvarna EPOS RS1 Operator's Manual page 18

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
To make a transport path
Operate the product and add waypoints on the
map to install a transport path. Start in a work area
minimum 1 m / 3.3 ft. from the virtual boundary.
Install the transport path perpendicular to the
virtual boundary of the work area.
Do not install a transport path across a stay-out
zone.
Do not set waypoints that make the transport path
go across the same transport path.
Do not make sharp bends when you install the
transport part.
135º
135º
Operate the product and add waypoints to connect
the transport path to the docking point.
Put the last waypoint on a transport path (A) in
an angle of +/-45 degrees seen from the docking
point.
A
Save the transport path to automatically connect
the last waypoint to the docking point.
Set the corridor width (A) for the transport path.
The corridor width can be set to 2-5 m / 6.6-16.4 ft.
18 - Installation
To make a maintenance point
Operate the product and add waypoints on the
map. Start to add waypoints at the position
where you install the maintenance point. The first
waypoint specifies the maintenance point.
Do not make sharp bends when you install a
transport part.
<90º
Operate the product and add waypoints to make a
path to the charging station.
Put the last waypoint on a transport path (A) in
an angle of +/-45 degrees seen from the docking
point.
Save the maintenance point to automatically
connect the last waypoint to the docking point.
Set the corridor width (A) for the maintenance
point. The corridor width can be set to 2-5 m /
6.6-16.4 ft.
A
135º
135º
A
2211 - 002 - 30.11.2023
B
<90º

Advertisement

Table of Contents
loading

Table of Contents