Husqvarna EPOS RS1 Operator's Manual page 13

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
8.
Connect the low-voltage cable to the charging
station.
9.
Close the hatch on the front of the charging
station.
10. Put the power supply at a minimum height of 30
cm / 12 in.
min 30 cm / 12"
11. Connect the power supply cable to a 100-240V
power outlet.
Note:
The product can be put in the charging
station to charge while you install the boundary
wire.
12. Put the low-voltage cable in the ground with stakes
or bury the cable.
13. Connect the wires to the charging station after
the installation of boundary wire and guide wire is
complete.
14. Attach the charging station to the ground with the
supplied screws after the guide wire is installed.
3.10.4.2 To do a visual check of the charging station
1.
Make sure that the indicator LED lamp on the
charging station has a green light.
2211 - 002 - 30.11.2023
2.
If the indicator LED lamp does not have a green
light, do a check of the installation. Refer to
indicator lamp on the charging station on page 23
To install the charging station on page 12 .
and
3.10.5 Installation of the reference station
You can install the reference station on a post or a wall.
CAUTION:
Movements of the reference
station will affect the correction data sent to
the product with the accurate position. The
reference station must be installed tightly on
the post or wall.
CAUTION:
The items on the map will
change position if you move the reference
station. Adjust the items on the map or do
the installation again in the Automower
Connect app.
3.10.5.1 To install the bracket on a wall
Note:
Screws are not included. Use screws that are
applicable for the wall material.
1.
Hold the arm of the reference station on the wall.
Make 2 marks on the wall for the 2 screws.
LED
®
Installation - 13

Advertisement

Table of Contents
loading

Table of Contents