Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual page 519

Table of Contents

Advertisement

Concluding steps
▶ If applicable, install the TPM, see
▶ Install the iRMC microSD card, see
page
504.
Ensure that you install the iRMC microSD card that was installed in
the system board before the replacement.
▶ If applicable, install all expansion cards, see
on page
269.
"Installing the crossbar" on page
"Installing the fan cage" on page
▶ Install all riser modules, see
▶ For a system with air cooling, proceed as follows:
▶ Install all memory modules, see
page
341.
Ensure that you reinstall each memory module in the slot it was
located before the replacement.
▶ If applicable, install all dummy memory modules, see
dummy modules" on page
▶ Only for system with air cooling: install the air duct, see
duct" on page
79.
"Reassembling" on page
▶ If applicable, install the OCP modules, see
page
262.
▶ Install all PSUs, see
▶ Connect all external cables.
"Connecting the power cord" on page
RX2540 M7
"Installing the TPM" on page
"Installing the iRMC microSD card" on
84.
77.
"Installing a riser module" on page
"Installing memory modules" on
347.
59.
"Installing a hot-plug PSU" on page
65.
Upgrade and Maintenance Manual
System board and components
"Installing an expansion card"
"Handling memory
"Installing the air
"Installing an OCP module" on
126.
493.
74.
519

Advertisement

Table of Contents
loading

Table of Contents