Installing The Hob Flush With The Worktop - Miele KM 7360 FR Operating And Installation Instructions

Table of Contents

Advertisement

Installation
Installing the hob flush with the
worktop
 Create the worktop cut-out. Remem-
ber to maintain the minimum safety
distances (see "Installation – Safety
distances").
 Solid wood, tiled and glass worktops:
Fix a wooden frame 5,5 mm below
the top edge of the worktop.
Risk of damage from incorrect
connection.
The hob electronic module may be
damaged if a short circuit occurs.
The mains connection cable must be
connected to the hob by a qualified
electrician.
 Connect the mains connection cable
to the hob by following the instruc-
tions in the wiring diagram (see "In-
stallation – Electrical connection").
 Attach the sealing strip provided un-
derneath the edge of the hob. Do not
apply the sealing strip under tension.
 Feed the mains connection cable for
the hob down through the worktop
cut-out.
The gap between the ceramic surface
and the worktop must be at least
2 mm wide. This is required so that
the hob can be sealed.
 Centre the hob in the cut-out.
 If an air intake-optimised base panel
is installed, position the hob so that
the fans are located above the cut-
outs.
92
 Connect the hob to the electricity
supply (see "Installation – Electrical
connection").
 Check that the hob works.
 Seal the gap between the hob and
worktop with a silicone sealant that is
heat-resistant to at least 160 °C.

Advertisement

Table of Contents
loading

Table of Contents