Download Print this page

Toshiba GR-200-5 Instruction Manual page 909

Multi functional protection ied

Advertisement

should check whether the required signals are mapped in the default
configuration.
*Note: There is no default configuration for GOOSE subscription. If GOOSE subscribe
function is required, then a new configuration has to be done.
To verify the signals configured for the IEC 61850 protocol, the user should check
the mapped data, Dataset or Report Control list. If they have existed, the signals
in the signal list should be matched with the attributes of LNs.
Figure 11.3-11 shows an example to check if the signals are mapped in default
configuration. For example, to check for mapping of the primary element signal
in earth fault protection (EF1), follow the steps below:
1. To check if the EF1 signal is already mapped in the LN, key 'EF1' under Signal
Name in the Signal List screen.
Mapped data
Figure 11.3-11 Signal mapping
As shown in the above figure, the "EF1" signal is already mapped to LN
attribute Prot/EF_PTOC1$Str1, general.
2. To check if "Prot/EF_PTOC1$Str1, general" is already added in Dataset. Right
click on
"LLN0" and select Edit DataSet, then DataSet List screen appears as
Figure 11.3-12
shown in
.
- 889 -
6F2T0207 (0.01)
"EF1" in signal list
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6