ABB ACQ580-01 Quick Installation And Start-Up Manual page 8

Table of Contents

Advertisement

4.
Frames R1...R2, R4, R6...R9: Install the grounding shelf. In frames R6...R9, this is the grounding shelf for the control
cables.
R1...R2
4
R6...R9
4
5.
Frame R5: Install the cable box plate (a) and shroud (b).
R5
5a
6.
Attach the cables outside the drive mechanically.
7.
Ground the motor cable shield at the motor end. For minimum radio frequency interference, ground the motor cable
shield 360° at the cable entry of the motor terminal box.
7
R4
4
5b
8

Advertisement

Table of Contents
loading

Table of Contents