Hitachi Relion RES670 Commissioning Manual page 9

Phasor measurement unit
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

1MRK 511 409-UUS Rev. K
10.1.1
Requirements.......................................................................................................................... 67
10.1.2
Preparing the IED to verify settings.........................................................................................68
10.2
Activating the test mode............................................................................................................ 69
10.3
Preparing the connection to the test equipment........................................................................69
10.4
Connecting the test equipment to the IED.................................................................................70
10.5
Releasing the function to be tested........................................................................................... 71
10.6
Verifying analog primary and secondary measurement............................................................ 72
10.7
Testing the protection functionality............................................................................................ 73
10.8
Forcing of binary input/output signals for testing.......................................................................73
10.8.1
Forcing concept.......................................................................................................................73
10.8.2
How to enable forcing..............................................................................................................74
10.8.2.1
10.8.2.2
10.8.3
How to change binary input/output signals using forcing........................................................ 74
10.8.3.1
10.8.3.2
10.8.4
10.8.4.1
10.8.4.2
10.8.4.3
Section 11
Testing functionality by secondary injection................................................. 81
11.1
Testing disturbance report......................................................................................................... 81
11.1.1
Introduction..............................................................................................................................81
11.1.2
Disturbance report settings..................................................................................................... 81
11.1.3
Disturbance recorder (DR)...................................................................................................... 81
11.1.4
Event recorder (ER) and Event list (EL).................................................................................. 82
11.2
Identifying the function to test in the technical reference manual .............................................82
11.3
Impedance protection................................................................................................................82
11.3.1
Power swing detection, blocking and unblocking ZMBURPSB............................................... 82
11.3.1.1
11.3.1.2
11.3.1.3
11.3.2
Out-of-step protection OOSPPAM ..........................................................................................90
11.3.2.1
11.3.2.2
11.3.2.3
11.3.2.4
11.4
Current protection....................................................................................................................106
11.4.1
11.4.1.1
11.4.1.2
Phasor measurement unit RES670
Commissioning manual
Enable forcing by using LHMI............................................................................................ 74
Enable forcing using TESTMODE function block...............................................................74
Forcing by using LHMI....................................................................................................... 75
Forcing by using PCM600.................................................................................................. 76
Undo forcing by using TESTMODE component.................................................................78
Undo forcing by using LHMI............................................................................................... 78
Undo forcing by using PCM600..........................................................................................78
Function revision history.....................................................................................................83
Verifying the signal and settings.........................................................................................83
Completing the test............................................................................................................ 90
Verifying the settings.......................................................................................................... 90
parameter ReachZ1........................................................................................................... 98
Function revision history...................................................................................................107
Verifying the settings........................................................................................................ 107
© 2017 - 2022 Hitachi Energy. All rights reserved
)..........................................................................................94
)...................................................................................102
Table of contents
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents