5.
Select Use the following IP address and define IP address and Subnet mask if the front port is
used and if the IP address is not set to be obtained automatically by the IED,see
address must be different from the IP address chosen for the IED.
IEC13000062 V1 EN-US
Figure 7:
6.
Use the ping command to verify connectivity with the IED.
7.
Close all open windows and start PCM600.
Phasor measurement unit RES670
Commissioning manual
IEC13000060-1-en.vsd
Select the TCP/IPv4 protocol and open Properties
IEC13000062-1-en.vsd
Select: Use the following IP address
© 2017 - 2022 Hitachi Energy. All rights reserved
Section 4
Starting up
Figure
7. The IP
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents