Hitachi Relion 670 Series Commissioning Manual page 52

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 4
Starting up
IEC13000060 V1 EN-US
Figure 6:
5.
Select Use the following IP address and define IP address and Subnet mask if the front port is
used and if the IP address is not set to be obtained automatically by the IED,see
address must be different from the IP address chosen for the IED.
IEC13000062 V1 EN-US
Figure 7:
6.
Use the ping command to verify connectivity with the IED.
7.
Close all open windows and start PCM600.
46
IEC13000060-1-en.vsd
Select the TCP/IPv4 protocol and open Properties
IEC13000062-1-en.vsd
Select: Use the following IP address
© 2017 - 2023 Hitachi Energy. All rights reserved
1MRK506371-UUS Rev. M
Figure
7. The IP
Line distance protection REL670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rel670

Table of Contents