Section 11
Testing functionality by secondary injection
ANSI07000010 V1 EN-US
Figure 28:
Table 26:
Test
points
1
2
3
Check also in the same way as for phase-to-ground fault for each test point that the output signals
PHG_FLT, are activated where x refers to the actual phase to be tested. After the timer tPG for the zone
has elapsed, also the signals TRIP, TRPG and TR_x shall be activated.
11.4.4
Faulty phase identification with load encroachment FMPSPDIS
(21)
There is no specific test routine for this function. The function is tested in conjunction with other
impedance (mho) functions.
11.4.5
Distance protection zones, quadrilateral characteristic, separate
settings ZMRPDIS (21)
Prepare the IED for verification of settings as outlined in section
Consider releasing Zone 1 with the Phase selection with load encroachment, quadrilateral characteristic
(FRPSDPIS). If the autorecloser is not released and in service, trip will always be three phase.
Measure operating characteristics during constant current conditions. Keep the measured current as
close as possible to its rated value or lower. But make sure it is higher than 30% of the rated current.
100
X
50%
ZAngPG
Proposed test points for phase-to-ground faults
Test points for phase-to-ground loops A-B (Ohm/Loop)
Reach
Value
X
ZPG · sin(ZAngPG)
R
ZPG · cos(ZAngPG)
X
0,5·ZPG · sin(ZAngPG)
R
0,5·ZPG + ΔR = 0,5·ZPG · (1 - cos(ZAngPG))
X
0,5·ZPG·sin(ZangPG)
R
0,5·ZPG - ΔR = 0,5·ZPG · (1 - cos(ZAngPG))
© 2017 - 2023 Hitachi Energy. All rights reserved
R
Ohm/loop
ANSI07000010-1-en.vsd
Comments
"Preparing for test"
1MRK506371-UUS Rev. M
GUID-79761A97-A99A-4788-94A5-341308DF6E45 v3
GUID-A35C2DED-70A6-4E96-864D-3A6C1147B350 v3
in this chapter.