Beko QWIK-PURE 15 Installation And Operation Manual page 99

Table of Contents

Advertisement

Installation and operation manual
Illustration
1.
Dry the cleaned assembly with a cotton cloth.
2.
Transport the cleaned and dried assembly unit to the place of installation of the QWIK‑PURE
and mount it.
3.
Put the QWIK‑PURE
Description / explanation
Clean FRC
Carefully wipe clean the sensor tubes of the
following sensors with a damp cloth.
Clean pressure relief chamber
Flush the pressure relief chamber with warm water.
Concluding work
 back into operation (see section "8. Commissioning" on page 63).
®
High Level Alarm (HLA) sensor
High Level (HL) sensor
Low Level (LL) sensor
QWIK-PURE
®
®
99 | 124

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 30Qwik-pure 60Qwik-pure 90

Table of Contents